Offshore / Oil & Gas
Booster Station Pump Skid
APT Global plays major role in construction and installation of 5MW land based booster station "Al Jabbar" for a satisfied Van Oord. After fabrication and machining of the 50+ Ton foundation skid structure in one of our UAE facilities the structures and components were shipped to the project site in Kuwait.
APT Global mobilized a dedicated team of specialists and equipment to undertake the complete turn- key mechanical installation of Electric motor, Gearbox and 1000mm pipe line diameter Dredge Pump, supporting Van Oor's project team.
Other Projects
Heavy Fabrication

Mooring Dolphin

Mooring Dolphin

Mooring Buoy

Mooring Buoy

Straddle Carrier

Straddle Carrier

Vertical Grout Silos & lifting cage

Vertical Grout Silos & lifting cage

Crane Pedestal

Crane Pedestal

Crane Manufacturing

Crane Manufacturing

Boat Landing Platform

Boat Landing Platform

Hawser Reels

Hawser Reels

Tremie Pipe

Tremie Pipe

Neom Project - Floating Villa Foundation

Neom Project - Floating Villa Foundation

Cement Tank

Cement Tank

Cold Box

Cold Box

First Discharge Point Hopper

First Discharge Point Hopper

LNG Skid

LNG Skid

Fall Pipe Equipment

Fall Pipe Equipment
Parts & Components

Coupling Pontoon

Coupling Pontoon

Y-Pontoon

Y-Pontoon

Load Testing Fixture

Load Testing Fixture

Drill Pipe Stabilizer

Drill Pipe Stabilizer

Dulam-Clamp

Dulam-Clamp

Valve Body

Valve Body

Bisep Parts- 48 inches

Bisep Parts- 48 inches
Offshore Containers

Cylinder Racks

Cylinder Racks
Rig-and-Platform-Repair

Wave-Sierra