APT Global successfully delivered two sand carriers to the renowned dredging contractor Van Oord. The hopper barges were converted for more effective utilization by the construction and installation of a bow coupling system with all associated piping and loading boxes.
The contract involved the building of a bow coupling tower, the construction of discharge piping, support structures, walkway platform, and hydraulic piping. The prefabrication work was completed at the APT RAK yard before moving to the installation phase. The converted sand carrier passed all the tests and was built to suit the requirements of Van Oord.
This is a significant achievement for APT Global, as it demonstrates their capabilities in the marine construction and engineering sector.
Other Projects
New Building
Anchor handling pontoon
Anchor handling pontoon
Fugro oceanus
Fugro oceanus
Modular pontoon
Modular pontoon
Split Hopper- HUTA 909/910
Split Hopper- HUTA 909/910
Split Hopper-Nareel
Split Hopper-Nareel
Split Hopper-Maghiam
Split Hopper-Maghiam
Cutter Suction Dredger CSD-500
Cutter Suction Dredger CSD-500
Jetty Pontoon
Jetty Pontoon
Conversion
Rock Transfer Barges Conversion
Rock Transfer Barges Conversion
Split Hopper Dredger to Fall Pipe Vessel
Split Hopper Dredger to Fall Pipe Vessel
Spreader Pontoon Conversion
Spreader Pontoon Conversion
Fall Pipe Equipment
Fall Pipe Equipment
Dry Docking
Dry docking repairs HAM 218
Dry docking repairs HAM 218
Dry docking repairs AL HAMRA
Dry docking repairs AL HAMRA
Igazu
Igazu
Maghiam
Maghiam
Macna
Macna
Miltiades-4
Miltiades-4
Mirfa
Mirfa
Nareel
Nareel
Tug-DN63
Tug-DN63
Windbuild
Windbuild
Afloat Repair
Fairway
Fairway
Oceanic Installer
Oceanic Installer
Terraferre