Dredging
Split Hopper-Maghiam
APT Global Dubai was awarded a contract for the construction and delivery of 2 split hopper barges with a capacity of 2100 M3 for NMDC in June 2019. Due to time and market constraints, APT Global Marine Service bought two available hulls, in concert with the client. The hulls were towed to her yard where they were subject of the entire outfitting, component installation, Classification and commissioning. Specific project related requirements of the clients have been integrated within the limited time frame.
Both Vessel were rechristened with new names NAREEL and MAGHIAM. Both vessels were delivered to NMDC base at Abu-Dhabi during January 2020.
Vessel Information:
Length | :72.00 m |
Breadth | :16.50 m |
Depth | :5.50 m |
Dredging Draught | :4.80 m |
Gross Tonnage | :1985 |
Net Tonnage | :620 |
Capacity | :2100m3 |
Class | :Bureau Veritas |
Other Projects
New Building
Split Hopper- HUTA 909/910
Split Hopper- HUTA 909/910
Cutter Suction Dredger CSD-500
Cutter Suction Dredger CSD-500
Fugro Oceanus
Fugro Oceanus
Split Hopper-Nareel
Split Hopper-Nareel
Dredger-Repair
HAM218
HAM218
AL-HAMRA
AL-HAMRA
MIRFA
MIRFA
IGAZU- Repair
IGAZU- Repair
Parts-Components
Specialized Coupling
Specialized Coupling
Top Side Lifting Spreader Bar
Top Side Lifting Spreader Bar
Spud Carrier
Spud Carrier
Water Box
Water Box
UCW- Ladder Cutter Wheel
UCW- Ladder Cutter Wheel
Sheave Block Assembly
Sheave Block Assembly
Drag Head
Drag Head
Cutter Ladder Front Part
Cutter Ladder Front Part
Chute
Chute
Bottom door
Bottom door
Booster Station Pump Skid
Booster Station Pump Skid
Auxiliary spud carrier
Auxiliary spud carrier
Cutter Ladder
Cutter Ladder
Anchor Boom
Anchor Boom
Main Spud Carrier-CSD-900
Main Spud Carrier-CSD-900
Hauling-Mast
Hauling-Mast
Fall Pipe Equipment Construction
Fall Pipe Equipment Construction
Draghead
Draghead
Side-wire Sheave-Block Guide-Sheave-Unit
Side-wire Sheave-Block Guide-Sheave-Unit
Sinker Pipeline