Dredging
HAM218
APT Global Marine Services successfully dry-docked the cutter suction dredger HAM 218 for the Van Oord Ship Management B.V. at DMC Dubai. The dry-docking and repair work took place over a period of 10 days and included a number of major tasks.
This is a major achievement for APT Global, as HAM 218 is the first large cutter suction dredger to ever dry dock within DMC. The successful completion of this project reaffirms APT Global's position as a rapidly growing player in the maritime repair market.
The dry-docking and repair of HAM 218 is a testament to APT Global's expertise and capabilities. The company has a proven track record of successfully completing complex projects and is confident that it can continue to provide its customers with the highest quality of service
Other Projects
New Building
Split Hopper- HUTA 909/910
Split Hopper- HUTA 909/910
Cutter Suction Dredger CSD-500
Cutter Suction Dredger CSD-500
Fugro Oceanus
Fugro Oceanus
Split Hopper-Nareel
Split Hopper-Nareel
Split Hopper-Maghiam
Split Hopper-Maghiam
Dredger-Repair
AL-HAMRA
AL-HAMRA
MIRFA
MIRFA
IGAZU- Repair
IGAZU- Repair
Parts-Components
Specialized Coupling
Specialized Coupling
Top Side Lifting Spreader Bar
Top Side Lifting Spreader Bar
Spud Carrier
Spud Carrier
Water Box
Water Box
UCW- Ladder Cutter Wheel
UCW- Ladder Cutter Wheel
Sheave Block Assembly
Sheave Block Assembly
Drag Head
Drag Head
Cutter Ladder Front Part
Cutter Ladder Front Part
Chute
Chute
Bottom door
Bottom door
Booster Station Pump Skid
Booster Station Pump Skid
Auxiliary spud carrier
Auxiliary spud carrier
Cutter Ladder
Cutter Ladder
Anchor Boom
Anchor Boom
Main Spud Carrier-CSD-900
Main Spud Carrier-CSD-900
Hauling-Mast
Hauling-Mast
Fall Pipe Equipment Construction
Fall Pipe Equipment Construction
Draghead
Draghead
Side-wire Sheave-Block Guide-Sheave-Unit
Side-wire Sheave-Block Guide-Sheave-Unit
Sinker Pipeline