News

Explore our most recent construction projects from markets across the globe

News

27 Aug 2024

APT Global successfully delivers Drydocking/Repowering Project for NMDC Dredging & Marine - CSD Umm Al Zemoul

READ MORE
19 Jul 2024

APT GLOBAL Marine and Offshore Engineering Expands Operations with New Office in Taiwan to Support Offshore Wind Construction/mobilisation Services

READ MORE
16 May 2024

APT GLOBAL EXECUTES IN RECORD TIME 6000T/3000T SHIPLIFT – DMC UPGRADATION WORKS

READ MORE
16 May 2024

APT Global Marine Offshore Engineering (APT), UAE proudly announces the successful fabrication and delivery of two number Pre-Piling template for their prestigious client-DEME Offshore

READ MORE
11 Mar 2024

APT GLOBAL WLL QATAR BRANCH CELEBRATES 18TH ANNIVERSARY

READ MORE
11 Mar 2024

Spud can Extension unit for NMDC ENERGY

READ MORE

Fugro Oceanus Delivered

07 Jun 2023

"Fugro Oceanus" is a modular self-elevating drilling platform built under RINA classification and is designed to carry out marine soil investigation works related to dredging in coastal waters, ports and tidal waters in depths of up to 25m.

Measuring 12.2 x 9.8m the platform comprises of four modular pontoons locked together by a proprietary locking arrangement. Each pontoon comprises of three individual watertight compartments and is designed to stay afloat with any three compartments totally flooded.

Mark Heims from Fugro Middle East said: "The Fugro Oceanus was commissioned to be built as a compliment to the six Self Elevating Platforms that Fugro Middle East operate in the region for Geotechnical exploration.

"We have chosen to work with APT on the building of this SEP because of their flexibility in resolving the specific issues that relate to such platforms, as well as commercial considerations.

"With the service we have experienced up to this point we would consider APT Global as a preferred supplier for similar "New Builds" in the future."

The platform is jacked up using a hydraulic jacking unit and a block locking device on each of the 4 legs.

Deck equipment generally includes a hydraulic power pack, backup hydraulic power pack, a drilling rig, pipe rack, water pump and a generator.