News

Explore our most recent construction projects from markets across the globe

News

28 Mar 2025

APT Global Marine and Offshore Engineering Earns EcoVadis Sustainability Commitment Badge

READ MORE
28 Mar 2025

APT Global Marine and Offshore Engineering Participates in Offshore Wind Energy Conference and Exhibition in Amsterdam

READ MORE
18 Nov 2024

NMDC VESSEL CSD AL KHATEM- DELIVERED AFTER DOCKING/REFURBISHMENT WORKS

READ MORE
18 Oct 2024

APT Global delivers reinstatement project for heavy transport vessel Forte

READ MORE
18 Oct 2024

APT Global Celebrates 21st Anniversary and Excellence Day

READ MORE
27 Aug 2024

APT Global successfully delivers Drydocking/Repowering Project for NMDC Dredging & Marine - CSD Umm Al Zemoul

READ MORE

APT Global Marine Offshore Engineering (APT), UAE proudly announces the successful fabrication and delivery of two number Pre-Piling template for their prestigious client-DEME Offshore

16 May 2024

This milestone underscores our commitment to delivering cutting-edge products that meet the evolving needs of our clients.Offshore substation foundations installation in its initial stage will need to have the pin piles installed on the seabed. This execution will be performed using the self-levelling piling template which will be deployed overboard from a floating vessel into its designated location at the seabed. The piling template shall serve the following purposes:

- Allow stabbing of pin-piles and further driving in to designed depths using Vibrohammer.

- Allow for interface with drilling equipment.


Template 1: Coastal Virginia Offshore Wind, USA

 ·         Four legged template

 ·         Overall dimension : L43.81m x W35.81m x H40.26m

 ·         Total Weight: 697T

 ·         Material Grades: NVE36


Template 2: Le Tréport Offshore Wind Farm Project

 ·         Four legged template

 ·         Overall dimension : L26.76m x W27.55m x H13.78m

 ·         Total Weight: 430T

 ·         Material Grades: NVE36

           Class : DNV


The fabrication and delivery of the Pre-Piling templates involve a meticulous process to guarantee its quality, tolerance level and functionality requirements. By adhering to industry standard and project specifications, APT ensured timely delivery by following efficient and precise planning. This achievement is a testament to the dedication and expertise of our talented project team.


The ON TIME delivery of the templates marks a significant enhancement to the operational capability of our client, empowering them to meet the demanding requirements of piling operations for two large Offshore Windfarm installations. We extend our sincere gratitude to DEME Offshore for showing belief in APT.


As we continue with our efforts to innovate and modernize, meeting the high expectations of our clients, this accomplishment reinforces our position as a trusted provider of High Quality solutions in the Wind farm construction/installation industry.