News

Explore our most recent construction projects from markets across the globe

News

11 Mar 2024

APT GLOBAL WLL QATAR BRANCH CELEBRATES 18TH ANNIVERSARY

READ MORE
11 Mar 2024

Spud can Extension unit for NMDC ENERGY

READ MORE
09 Mar 2024

Happy International Women's Day!

READ MORE
01 Aug 2023

APT Global Marine and offshore engineering UAE is delighted to announce the completion of manufacture and delivery 100-ton silos for the prestigious offshore wind project in Taiwan.

READ MORE
03 Jul 2023

Offshore wind installation vessel Voltaire – successful completion of construction, installation and commissioning of monopile/sea fastening system.

READ MORE
26 Jun 2023

APT Celebrates 20 Years of Success and Innovation

READ MORE

APT Global Delivers Modular Spud Pontoon

07 Jun 2023

We recently delivered a 24x 12m modular spud barge to Dubai based Ecocoast Contracting.

The pontoon is designed and built in-house and consists of interchangeable modules which are connected by our own rigid connection system allowing for flexible configuration to suit any requirement.

It comes equipped with removable heavy duty loading ramps and two 16m long spuds with hydraulically operated spud housings powered by an APT built hydraulic system.

The pontoon system has been specifically designed for high deck loads, this particular setup has been specified to accommodate the point loads introduced by a crawler crane up to 100T.