Split Hopper Barge

  • Split hopper barge
  • Split hopper barge
  • Split hopper barge
  • Split hopper barge
  • Split hopper barge
  • Split hopper barge
  • Split hopper barge
  • Split hopper barge
  • Split hopper barge
  • Split hopper barge
Description

APT Global Marine Services delivered two non-propelled 1800m3 Spit hopper barges to M/s HUTA Hegerfeld Saudia Ltd. The blocks for the vessels were constructed at a yard in Thailand and hereafter transported to APT facility at Ras Al Khaimah for completion and delivery..

The vessels named, HUTA 909 & HUTA 910, hit the water at APT Global RAK facility on November 2019.

With the delivery of these two Split hopper barges, APT Global Marine became the first Shipyard in the Middle East to construct and deliver this type of vessels. The vessels are classed under Bureau Veritas for unrestricted navigation. Also, the vessel complies with ARAMCO norms associated with floating craft.

HUTA909 & HUTA910 Specifications

Length :               76.70 m
Breadth :               14.50 m
Depth :               5.80 m
Dredging Draught  :               5.00 m
Gross Tonnage :               1558 T
Capacity :               1800 m3

 

New building

CSD 500

Split Hopper Barge

Fugro oceanus

Parts & components

Main spud carrier - CSD-900

Auxiliary spud carrier - CSD 900

Cutter ladder front part

Spud carrier tilting frame – CSD 900

Spud and spud housing

Side wire sheave block and guide sheave unit

Draghead

Upper hoisting sheave block and lower pivot point

Gantry

Safety valve

Anchor boom

Bottom door

Hauling mast

Overflow

Sinker pipeline installation

Pontoon

Booster station

Waterbox

Construction of gravity anchors

Bow coupling

Jet pipe

Suction tube

Reclamation gate valve

Spud for backhoe

Arm piece

Turning gland

Valve-Body

UCW- Ladder Cutter Wheel Assembly

Spring Box-Water injection

Side Wire Sheave Block

Sheave Block Assembly

Repair/ Refurbishment/ Conversion

Dry docking repairs HAM 218

Dry docking repairs AL HAMRA

Dry docking repairs IGUAZU